Turn an existing outdoor slab into a phased basketball court proposal. Compare what opens on day one, which upgrades can wait, and what each sponsor could cover.
Who funds the build?
Replace the illustrative USD allowances with vendor quotes. Previewing an earlier phase leaves the full plan intact.
Assumes an existing usable slab. Site preparation, engineering, permits, taxes and installation requirements need local review.